nmartin7537 nmartin7537
  • 04-01-2021
  • Mathematics
contestada

It takes 5 men 12 days ro complete a job how many days does it take 3 men to complete the job

Respuesta :

eloo59980
eloo59980 eloo59980
  • 04-01-2021

Answer:

5=12

3=? then Criss cross it and you will get 12*3 divided by 5 then you get 7.2

so the answer will be 7 days

Answer Link

Otras preguntas

​sebastian decides to open a tree farm. when deciding to open his own business, he turned down two separate job offers of $25,000 and $30,000 and withdrew $20,0
~PLEASE HELP ASAP OFFERING 12 POINTS~ Johnson Canniver has a repair shop. He bought a used lawn mower for $35.00 from a customer. He spent $39.17 on parts to re
What's the purpose of Wiesel's "The Perils of Indifference" speech? A. To inform B. To prioritize C. To entertain D. To persuade
why should congress control foreign and interstate trade and not the individual states?
In order To be exiled from Athens a significant amount of charges had to be brought in proven
How can you tell which mineral's atoms are bonded more closely?
A 20-foot ladder touches a building 16 feet up the wall. What is the measure of the angle the ladder makes with the ground (mACB)?
Paula, a college student, earned $3,600 one summer. During the following semester, she spent $2,500 for tuition, $650 for rent, and $430 for food. The rest went
WILL GIVE BRAINLIEST if you find area of figure
Find the slope of the line through the psi of points A(2, -3), p(2,9)