mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

alyssa received 30,000 from an inheritance and invests in a certificate of deposit paying 5% annual interest and the rest in apple inc. offering an annual retur
T divided by 2 equals 2/5 + 3/4
Which of the following is an example of maintaining academic integrity? A. Using graphs, tables, or diagrams that someone else created, without citing
​the employees of a company feel that rewards are fairly allocated. this illustrates _____.
A 62-year-old man suddenly experienced difficulty speaking and left-sided weakness. he meets initial criteria for fibrinolytic therapy, and a ct scan of the bra
Slopes that drop or rise sharply in elevation are:
Which is a bacterial infection that is common among teens and has symptoms of fever, sore throat, and swollen glands? Lyme disease strep throat meningitis tuber
what is 86.8954776543 rounded to the nearest millionth/ show work
Which expression results when the change of base formula is applied to log4(x+2) ?
An equation of the form ax+b=0 is called a​ __________ equation or a​ ________________ equation.